first Stelltag Part 2
Yesterday everything was perfect: the weather, the professional and strong control team of finger house , the parts themselves and the structure of our rather simple cottage. Results: The house is almost finished, and on 1 Stelltag! This pace has given us then but unprepared, and we had our planned for Friday, topping out spontaneously as early as Thursday evening to celebrate the small circle. Luckily, the nursery has as fast a nice Perch can make, which we then decorated in WM-color :-) have
Our celebration on Friday, we have now renamed and celebrate a "state" :-)
Here are some impressions of the Building:
Thursday, July 1, 2010
How Long Does Interior Paint Last In The Can?
first Stelltag Part 1
We just take a short break, an opportunity for a progress report. When we arrived at 5:30 clock to the site, the crane was already established and the first Truck has just made ready for unloading
It then rolling out the "Katja" did not take long until the first wall could be set:
Then one blow succession. About 3 hours later we were all inside walls, the heating had been raised in the equipment room and the first ceiling panel was on the way:
We are currently just flabbergasted at how quickly and accurately we Set Rupp work. And now over 30 degrees! Now schonmal thousand thanks to the team.
Our ceiling above the front door. What we like even better than in the pictures :-)
So now once again quickly now and the troops with water supply .... more pictures later.
We just take a short break, an opportunity for a progress report. When we arrived at 5:30 clock to the site, the crane was already established and the first Truck has just made ready for unloading
It then rolling out the "Katja" did not take long until the first wall could be set:
Then one blow succession. About 3 hours later we were all inside walls, the heating had been raised in the equipment room and the first ceiling panel was on the way:
We are currently just flabbergasted at how quickly and accurately we Set Rupp work. And now over 30 degrees! Now schonmal thousand thanks to the team.
Our ceiling above the front door. What we like even better than in the pictures :-)
So now once again quickly now and the troops with water supply .... more pictures later.
Subscribe to:
Posts (Atom)