Monday, August 30, 2010

Pony Xpress Motorhomes

Taming the devil machine

First of all we would like to thank all the visitors who were home on Sunday to show in our house. The nice conversations have been fun and let the dull day look like a little friendly. Particularly affectionate greetings go to Herborn! :-) The day has also shown us again that we are not alone with our previous experience ...

test sitting in the later dining

Today we began with the grinding of the concrete and this lent a single grinding machine from the hardware store (for local knowledge: Hercules Baumarkt in Herborn recommendation.!) The first try saw something like this as with the colleagues here ;-)

video

Later we have the devil machine tame but can and are finished with the entire ground floor. With the result We are actually pretty pleased. Actually, it all depends on, to lean towards the device sensitive, the rest is like magic. We have still two notches milled into the dining room, and there has to repair the tile ;-)

The devil machine

tomorrow afternoon we should be ready and want to start to fill .. it will be interesting.

The sintering layer. 2 large buckets of which we only have ground down in the EC

Before / After (as far as can be seen in the image)

Friday, August 27, 2010

Beautiful Salon Crossdress

preparations for external plaster

yesterday started preparations for the external cleaning, meaning it was filled with foam, cleaned up the scaffolding again and fill in the background and rendered, where necessary. On the second picture you can see where the cigar band is still available and where it was already plastered. We assume that the preparations are completed early next week and hope that the paint is applied in good weather during the week :-)

back already finished,
window are still taped

ready Left, right obi still free

Tuesday, August 24, 2010

Thinking Day Activities From Europe

House Tour on Sunday, 29.08.

has quite a spontaneous angefregt finger house to see if our house can be used to visit, and we agreed: Even on Sunday everyone is invited, which is sometimes want to see a medley for the small purse ;-)

finger house homepage

We will also be on site and look forward to guests for coffee and cake has fingers house taken care of.

Sunday, August 22, 2010

Dresses Shop In Belfast

there be light

Another step has been taken :-) On Thursday we made the purchase with the electrician, since the heater is drying to the floor and we have electricity. That is, now we can work till late at night in the house * cough *, listen to music and the chime does ....

Tuesday, August 17, 2010

Worksheets: Find The Hazards ...

first ascent

After 5 days we have now entered the first floor. As far as we can tell, everything looks very good and tight, at least, nothing seems to have come through the ceiling. Now it would be good if could soon go the heating system in operation so that the soil comes to temperature. The weather has meant not so good with us.

bedroom

floor recess for shower tray

Wednesday, August 11, 2010

Can Rabbits Eat Graefruit

brownies and waiting screed

the exposed column of our home port on Saturday added to our great surprise and the trench was filled again. By Saturday afternoon was not happening, so we had not expected it. Our suspicion fell on brownies, but it seems to have been our civil contractors, who had moved in on Saturday afternoon. Unfortunately, he has the correction of the drop "forget" that will happen later this week. Hopefully, we can finally close this chapter for good.

wait In the meantime, we look forward to our floor and the electricity meter. The screed seems to be delayed and is now scheduled for Thursday. When electricity, there has hardly been a misunderstanding, so the heater will not run until the middle of next week. That is, the screed must be dry by then alone to himself, which is according to statements of the project manager not a problem.

follow pictures show Sobal of thing.

Sunday, August 8, 2010

Male Scorpio Disappeared

Ready for the floor & concrete

First the good news: the floor is laid throughout the house and all the preparations for the flooring were getrofen. According to the plan come tomorrow. However, delaying the power connector (why I do not know, vacation time or missing your electrical meter at the Eon are the possible reasons), why must dry the floor at the beginning without heating. According to our site manager at the weather no problem.

look at the scenes as the air supply disappears into the floor insulation

living room / kitchen, look in the hallway

Art in: hoses, outgoing from the heating circuit

panel of the heating of whom stolen? ;-)

Unfortunately, there is another problem: the Hausanschlussäule by Eon was set flush against the wall. This has challenged our construction manager because the house is of course still plastered. So far so good, my cunning plan, auszubuddeln the column itself and easy to move by 10 cm, is magnificently clever: Our civil contractors have - without asking us or learn - the cast in the column bases ...

Now we have serious intentions to leave the house plastered around the column. Anything else would probably lead to further cost or at least a delay, because the base would be braces. We open a bottle of champagne when the chapter is earth and deep work finally finished. The work and our Contractors can not be calculated and take our last nerve.

column in concrete. Here, nothing moves more

connecting pillar set flush to recognize
too. The last piece of downpipe is slightly askew,
was because the rain water pipes too close to the wall set
. Cosmetic, but annoying.

Friday, August 6, 2010

Valima Invitation Wordings

No more weeds in pavement or slab joints



NEW - PAVEMENT JOINT SAND - to get polymer joint sand
The easiest way to a permanent joint


come dry - water - let dry - finished!

Prevents the spread of weeds
Permanently flexible
water permeability
applicable to all types of paving stones
little as 1 mm gap width
process very easy
little more work in laying
Does not process residue on the stone surface
Much cheaper than 2 K Kunstharzprodukte
PAVEMENT JOINT SAND is a novel polymer-bound paving joint mortar for the laying of concrete block paving, garden, walkway and patio stones, pavers, natural stone, polygonal plates, etc.
PAVEMENT JOINTING SAND is ideal for areas with low pollution: eg patios, paths, driveways, car parking, pedestrian zones, playgrounds, traffic islands, etc.
PAVEMENT JOINT SAND consists of high quality, very fine quartz sand and a binder. The material is ready mixed in 25 kg containers supplied. pour
PAVEMENT JOINT SAND just above the pavement surface and dry come into the joints. The material is so fine that even narrow gaps can be filled easily. Subsequently, the material remains are sprayed with a fine water mist. Initial contact with water activates the binder and the curing begins.
PAVEMENT JOINT SAND hardens permanently, but is flexible and can not Cracks. After spraying the area remain on the pad surface, no material traces. Should any damages or repairs to the joint with PAVEMENT JOINT SAND easily added.
PAVEMENT JOINT SAND is in the default color natural / beige available:
Packing: 25 kg - containers

Tuesday, August 3, 2010

Does Pityriasis Rosea Scar

unwanted heating the 2nd

Here are a few more pictures from the current state of completion of heating and plumbing. A large part of the heating side is now in place on the base, some of the lines are already connected. The air tubes in the floor are framed in part from the Styrofoam, the bedroom is already completely closed.






Now we have to hurry, so we crashed the opening to the loft before the airbags are designed!

Monday, August 2, 2010

Ar There Any Stores That Sell Zumba

The chaos has broken out

Yesterday photographed proudly swept, now our house looks like a battlefield ;-) This morning, the heating contractor be engaged and to pave the way for all the hoses and lines that need to be relocated. The house is now again full of material and we are pleased to again be able to marvel at the progress every day after work. If yes otherwise boring ;-)

Organized Chaos

mega-divers bottle or hot water tank?

Unfortunately, our civil contractors once repair: The House connection when filling column was pressed flush against the wall, so there could not be rendered. Our construction manager had today were very early time for us to answer a few questions and discuss the next steps including screed.

podium for the heating pedestals on stones

"air snake Lives": air hose in the guest room

Sunday, August 1, 2010

Period Pains, No Period And Lots Of Cm



popular request ;-) again a few pictures from the current status of our project: the excavation in front of the house is finally complete, the result is unfortunately not as nice as before. But we wanted to finally settle accounts with our civil engineers to conclude this unpleasant chapter. The fine work we leave it to someone that we trust more. At least
can now advance the artists, whenever it fits .. However, need to rebuild the skeleton, where it was dismantled in the meantime.

Current Exterior

are women, we have made good progress and the plaster-work has been completed for some time.

Besenrein ;-)

hall access to loft

half of the peak floor is laid with the rough sheet, the rest of us stand for cooler days . Our plumber was already there and the encapsulation for shower and bathtub made.


Tomorrow morning we discuss an appointment with the supervisor to the outstanding issues and next steps. If all goes well, begin tomorrow, work on the heating and sanitary preparation and early next week comes the screed. So are first off with other villains :-)