Wednesday, July 14, 2010

Pain From Urinating After Taking Plan B

Ready for heating water flow!

Finally back images from the current state of our fingers house. In the meantime, much has changed: the electricians are almost finished with the installation, the drywall is also on the home stretch (it is missing the 6 cm insulation in the hallway and bathroom and the sheet-rock in 3 rooms) and we are now at the electricity, Water and sewerage connected. Only the Telekom is a bottleneck, because the builders center is not easy to reach and never call back! It really is a scandal, which allows the large T here.

slat construction for the intersection of ceiling / angle in DG

Sorry, had to be partially zerbaggert for catering our clean-scale driveway and the splash guard, hopefully, the result looks as good as before. In any case the massive dust has called for filling the trench with sand to the neighbors on the plan. Fortunately, his anger was directed against the construction company, not against us. Still not pleasant ....

dust orgy

Our fathers have screwed the team in a real rush and put the two large rooms on the top floor with sheetrock finished. Now missing "only" the area in the stairwell, office and bathroom.


Finished room in the attic

In parallel, the city made the water connection and set the water meter and the Eon us connected to the mains and installed the house supply column. OK, we still have no electricity, which the company must Schilling soon Reconnect. Everything still runs on the construction sites.

water, telecommunications, electricity. All conduits already

The House Connection column occupied by the side of the house

When the Telekom is now in the slippers, the terrain can be refilled and the framework to be rebuilt, can be plastered with it. We look forward to our color :-)

Sunday, July 11, 2010

Tifany Towers In The Shower

Like ice in the sunshine ...

.. I'm melting away ... here the temperature at which we have interpreted the rest of wool in the loft.
More pictures from the current state are coming soon, currently we have no pleasure in the evening more energy to care about blogging ;-)'s

Sunday, July 4, 2010

Ikusa Suvia Uncensored Online

Expansion Pack 1: The beginning is made

After Provides Rupp has left and we celebrated with neighbors, friends and family to a beautiful setting hard, as now required. On the second Stelltag have the electrician was in the house and has the cable laid on the ground for the most part. Since he would like to make on Thursday in the DG further, we are now under time pressure: The insulation, vapor barrier and battens must be ready by then. And according to the current state we could do it even :-)

On Saturday we were able to enjoy the 4-0 to Argentina not really, because, and the prepares subsequent storm has worried: our downpipes could not even be connected. So I made on Saturday evening, a temporary solution to the drainage tube (see photos)

posing in front of glass wool: Masked figures




temporary solution for downpipes





Current status of the expansion pack 1

Thursday, July 1, 2010

What Does A Seafarer's Medical Involve

first Stelltag Part 2

Yesterday everything was perfect: the weather, the professional and strong control team of finger house , the parts themselves and the structure of our rather simple cottage. Results: The house is almost finished, and on 1 Stelltag! This pace has given us then but unprepared, and we had our planned for Friday, topping out spontaneously as early as Thursday evening to celebrate the small circle. Luckily, the nursery has as fast a nice Perch can make, which we then decorated in WM-color :-) have

Our celebration on Friday, we have now renamed and celebrate a "state" :-)

Here are some impressions of the Building:






How Long Does Interior Paint Last In The Can?

first Stelltag Part 1

We just take a short break, an opportunity for a progress report. When we arrived at 5:30 clock to the site, the crane was already established and the first Truck has just made ready for unloading


It then rolling out the "Katja" did not take long until the first wall could be set:


Then one blow succession. About 3 hours later we were all inside walls, the heating had been raised in the equipment room and the first ceiling panel was on the way:


We are currently just flabbergasted at how quickly and accurately we Set Rupp work. And now over 30 degrees! Now schonmal thousand thanks to the team.


Our ceiling above the front door. What we like even better than in the pictures :-)


So now once again quickly now and the troops with water supply .... more pictures later.