Tuesday, August 3, 2010

Does Pityriasis Rosea Scar

unwanted heating the 2nd

Here are a few more pictures from the current state of completion of heating and plumbing. A large part of the heating side is now in place on the base, some of the lines are already connected. The air tubes in the floor are framed in part from the Styrofoam, the bedroom is already completely closed.






Now we have to hurry, so we crashed the opening to the loft before the airbags are designed!

0 comments:

Post a Comment