Pain From Urinating After Taking Plan B

Ready for heating water flow!

Finally back images from the current state of our fingers house. In the meantime, much has changed: the electricians are almost finished with the installation, the drywall is also on the home stretch (it is missing the 6 cm insulation in the hallway and bathroom and the sheet-rock in 3 rooms) and we are now at the electricity, Water and sewerage connected. Only the Telekom is a bottleneck, because the builders center is not easy to reach and never call back! It really is a scandal, which allows the large T here.

slat construction for the intersection of ceiling / angle in DG

Sorry, had to be partially zerbaggert for catering our clean-scale driveway and the splash guard, hopefully, the result looks as good as before. In any case the massive dust has called for filling the trench with sand to the neighbors on the plan. Fortunately, his anger was directed against the construction company, not against us. Still not pleasant ....

dust orgy

Our fathers have screwed the team in a real rush and put the two large rooms on the top floor with sheetrock finished. Now missing "only" the area in the stairwell, office and bathroom.


Finished room in the attic

In parallel, the city made the water connection and set the water meter and the Eon us connected to the mains and installed the house supply column. OK, we still have no electricity, which the company must Schilling soon Reconnect. Everything still runs on the construction sites.

water, telecommunications, electricity. All conduits already

The House Connection column occupied by the side of the house

When the Telekom is now in the slippers, the terrain can be refilled and the framework to be rebuilt, can be plastered with it. We look forward to our color :-)