After Provides Rupp has left and we celebrated with neighbors, friends and family to a beautiful setting hard, as now required. On the second Stelltag have the electrician was in the house and has the cable laid on the ground for the most part. Since he would like to make on Thursday in the DG further, we are now under time pressure: The insulation, vapor barrier and battens must be ready by then. And according to the current state we could do it even :-)
On Saturday we were able to enjoy the 4-0 to Argentina not really, because, and the prepares subsequent storm has worried: our downpipes could not even be connected. So I made on Saturday evening, a temporary solution to the drainage tube (see photos)
posing in front of glass wool: Masked figures
temporary solution for downpipes
Current status of the expansion pack 1