After long weeks of sanding and filling, we could devote ourselves last weekend about the beautiful things in the house, so finally new pictures of the current status on Thursday, the laminate has been delivered, which we with professional support (again thanks to Christian have!) on Saturday largely been laid in the EC. The result has become truly great.
laminate of Master (Light Oak)
On Friday was really something going on in the house: two engineers from finger house have (almost) made the final work on the house finished, unpacked the house door (the series), windows etc. was set the same time built up the kitchen, what do we show absolutely because I am more than satisfied with the result:
front view kitchen
hob
As if that was not already enough, our plumber and most of mounted on the upper floor of the bathroom, the rest will be finished when our bathroom furniture is finally delivered:
shower with rain showers
We were not even too lazy and have taken care of in addition to catering for the specific color for the guest bathroom and bedroom. Who chose the colors in the toilet, I leave at this point even open ...
Toilets
ink interface in the bedroom
A hard weekend is behind us, but it has brought us to the intended move-in date before Christmas closer. Sorry, there are the delivery of the doors for longer than expected, which now is probably the biggest risk.
0 comments:
Post a Comment